|
 |
|
Diamond B
Construction Co. won an award for the milling and overlay of
Louisiana Highway 43 from its junction with Highway 10 to its
junction with Highway 38. The company cold planed the road,
corrected its slope and then applied two layers of HMA. The
completed road is notable for its smoothness, its overall aesthetics
and the high-quality of the HMA used on it. |
|
~source:
hotmix.org |

—Awarded the "Pavement Smoothness Award" for exceptional
efforts in providing quality construction, which led to the smoothest
Multi-Lift Asphalt Overlay project constructed on the National Highway
System in the State of Louisiana in 2002 on Interstate 12 and 2003 on
Interstate 10. |
|
|

—The Quality in Construction Award recognizes Hot Mix Asphalt (HMA)
pavements of excellence. "NAPA selects the recipients of its paving
awards using a known set of standards that have been shown to give a good
result," commented David B. Carlson, Chairman of the NAPA Board of
Directors. "This award demonstrates the high quality of work that
the HMA industry is achieving."
|
|
|

—Diamond
B Construction Co., LLC won a Quality in Construction Award for its work
on Interstate 10 in Jefferson Davis Parish. Because the road's average
daily trips numbered more than 42,000, the company faced restricted paving
during rush hours. It met the challenge by doing some nighttime paving
and by emphasizing safety for its workers and motorists. The use of informal
partnering with the state helped the contractor complete the project 119
days ahead of schedule, while producing a smooth, high-quality pavement.
Pavement ride quality was 72% below the minimum acceptable smoothness
requirements. |
|
|

—The second NAPA award-winning project was the
rubblizing and overlay of Interstate 12 in Livingston Parish. Challenges
included the high volume of paving to be done, nighttime paving, and innovative
paving techniques to help keep the mat smooth. The company successfully
partnered with the state on this project, completing it 23 days ahead
of schedule. Pavement ride quality was 66% below the minimum acceptable
smoothness requirements.
|
|
|
|
1978 |
Sheldon G. Hayes Finalist |
|
Location |
US Hwy 71 |
|
Awarded By |
National Asphalt Pavement Association |
|
|
|
|
|
2002 |
Quality in Construction |
|
Location |
I-12 (Livingston) |
|
Awarded By |
National Asphalt Pavement Association |
Project#: 454-02-0028 |
|
|
|
|
2002 |
Quality in Construction |
|
Location |
I-10 (Lacassine) |
|
Awarded By |
National Asphalt Pavement Association |
Project#: 450-03-0037 |
|
|
|
|
2002 |
Pavement Smoothness |
|
Location |
I-12 (Livingston) |
|
Awarded By |
Federal Highway Administration |
Project#: 454-02-0028 |
|
|
|
|
2003 |
Pavement Smoothness |
|
Location |
I-10 (Lacassine) |
|
Awarded By |
Federal Highway Administration |
Project#: 450-03-0037 |
|
|
|
|
2004 |
Quality in Construction |
|
Location |
I-10 (Egan) |
|
Awarded By |
National Asphalt Pavement Association |
Project#: 450-04-0084 |
|
|
|
|
2005 |
Quality in Construction |
|
Location |
LA Hwy 43 (St Helena) |
|
Awarded By |
National Asphalt Pavement Association |
Project#: 254-06-0015 |
|
|
|
|
2005 |
Quality in Construction |
|
Location |
I-49 (Rapides/Avoyelles) |
|
Awarded By |
National Asphalt Pavement Association |
Project#: 455-04-0018 |
|
|
|
|
2006 |
Quality in Construction |
|
Location |
I-12 (Slidell) |
|
Awarded By |
National Asphalt Pavement Association |
Project#: 454-04-0053 |
|
|
|
|
2006 |
Quality in Construction |
|
Location |
LA Hwy 2 (Morehouse) |
|
Awarded By |
National Asphalt Pavement Association |
Project#: 037-01-0022 |
|
|
|
|
2006 |
Quality in Construction |
|
Location |
I-49 (Rapides/Avoyelles) |
|
Awarded By |
Federal Highway Administration |
Project#: 455-04-0018 |
|
|
|
|
2006 |
Sheldon G. Hayes Finalist |
|
Location |
I-49 (Rapides/Avoyelles) |
|
Awarded By |
National Asphalt Pavement Association |
Project#: 455-04-0018 |
|
|
|
|
2007 |
Excellence in Construction |
|
Location |
I-12 (Slidell) |
|
Awarded By |
LA Department of Transportation |
Project#: 454-04-0053 |
|
|
|
|